2019-07-08
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 blocked apex and dirty sensors; downtime approx. 0.0666666666666667 hrs
|
|
2019-07-08
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 blocked apex and dirty sensors; downtime approx. 0.133333333333333 hrs
|
|
2019-07-08
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-07-08
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-07-08
|
NA
|
NA
|
Substrate Feed Pump #2 (Stand-By) Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-08
|
NA
|
NA
|
Subtrate Feed Pump #1 (Duty) Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-06
|
NA
|
NA
|
Raw Pulp Mix Pump #1 Replace Auger Liners
|
|
2019-07-06
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-07-06
|
NA
|
NA
|
Rotary Drum Screen Empty Plastics from bin
|
|
2019-07-05
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-07-05
|
NA
|
NA
|
Rotary Drum Screen Empty Plastics from bin
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #2 Pm
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #1 Pm Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Digestate Transfer Pump #2 Inspect Pump
|
|
2019-07-05
|
NA
|
NA
|
Suspension Buffer Tank SBT reached max setpoint.; downtime approx. 1.45 hrs
|
|
2019-07-05
|
NA
|
NA
|
Organic Extrusion Press #1 dirty LIT on hopper giving alarm; downtime approx. 0.283333333333333 hrs
|
|
2019-07-05
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 apex blockages, dirty sensors, and full sludge tank; downtime approx. 0.95 hrs
|
|
2019-07-05
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 Apex blockages, dirty sensors, and full sludge tank; downtime approx. 0.6 hrs
|
|
2019-07-05
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-07-05
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #2 Centrifuge Weekly Flushing
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #1 Centrifuge Weekly Flushing
|
|
2019-07-05
|
NA
|
NA
|
Bioreactor Aeration Blower # 3 (Standby) Aerzen D 62S Blower Weekly Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Bioreactor Aeration Blower # 2 Aerzen D 62S Blower Weekly Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Bioreactor Aeration Blower # 1 Aerzen D 62S Blower Weekly Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Membrane Aeration Blower # 2 Aerzen GM 10S Blower Weekly Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Membrane Aeration Blower # 1 Aerzen GM 10S Blower Weekly Maintenance
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #2 Centrifuge Weekly Flushing
|
|
2019-07-05
|
NA
|
NA
|
Centrifuge #1 Centrifuge Weekly Flushing
|
|
2019-07-04
|
NA
|
NA
|
Organic Extrusion Press #1 Cleaning of matrix
|
|
2019-07-04
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 Replace Lobes on pump # m24
|
|
2019-07-04
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-07-04
|
NA
|
NA
|
Digestate Transfer Pump #2 Inspect Pump
|
|
2019-07-04
|
NA
|
NA
|
Mix Pump Feed Auger #1 E-stop pressed by cleaning crew; downtime approx. 0.266666666666667 hrs
|
|
2019-07-04
|
NA
|
NA
|
Polished Pulp Mix Pump #2 high hopper level giving feed disable; downtime approx. 0.266666666666667 hrs
|
|
2019-07-04
|
NA
|
NA
|
Suspension Buffer Tank SBT stopped process from high level; downtime approx. 1.05 hrs
|
|
2019-07-04
|
NA
|
NA
|
Organic Extrusion Press #2 press tripping on high temperature; downtime approx. 0.133333333333333 hrs
|
|
2019-07-04
|
NA
|
NA
|
Organic Extrusion Press #1 Press tripping on high temperature; downtime approx. 0.1 hrs
|
|
2019-07-04
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 apex blockage and dirty sensors; downtime approx. 1.66666666666667 hrs
|
|
2019-07-04
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 Apex blockage and dirty sensors; downtime approx. 0.316666666666667 hrs
|
|
2019-07-04
|
NA
|
NA
|
MOL site visit in response to complaint
|
|
2019-07-04
|
NA
|
NA
|
Found Anaergia had increased AD and SBT level feed disable setpoints by about 0.5m from target setpoints distributed July 1st. Left as is.
|
|
2019-07-03
|
NA
|
NA
|
BIOREX HPU #1 hydraulic temperature high
|
|
2019-07-03
|
NA
|
NA
|
BIOREX HPU #2 cleaning radiator cleaning
|
|
2019-07-03
|
NA
|
NA
|
Digestate Transfer Pump #2 Digester line plugged
|
|
2019-07-03
|
NA
|
NA
|
Digestate Transfer Pump #1 Line to digester plugged
|
|
2019-07-03
|
NA
|
NA
|
Digestate Transfer Pump #2 Line plugged with material
|
|
2019-07-03
|
NA
|
NA
|
Digestate Transfer Pump #1 Clean out line
|
|
2019-07-03
|
NA
|
NA
|
Dynamic Cyclone #2 Screens Blocked causing motor fault on start up; downtime approx. 5.25 hrs
|
|
2019-07-03
|
NA
|
NA
|
Dynamic Cyclone #1 Screens Blocked causing motor fault on start up; downtime approx. 3.5 hrs
|
|
2019-07-03
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 apex blockage and sensor issues; downtime approx. 1.46666666666667 hrs
|
|
2019-07-03
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 apex blockage and sensor issues; downtime approx. 0.316666666666667 hrs
|
|
2019-07-03
|
NA
|
NA
|
Polished Pulp Mix Pump #2 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-03
|
NA
|
NA
|
Polished Pulp Mix Pump #1 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-03
|
NA
|
NA
|
Raw Pulp Mix Pump #2 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-03
|
NA
|
NA
|
Raw Pulp Mix Pump #1 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-07-02
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-07-02
|
NA
|
NA
|
Suspension Buffer Tank High Level on SBT stopped process; downtime approx. 7.65 hrs
|
|
2019-07-02
|
NA
|
NA
|
Reception Bag Opener #2 RBO bunker was empty; downtime approx. 0.333333333333333 hrs
|
|
2019-07-02
|
NA
|
NA
|
Reception Bag Opener #1 RBO bunker was empty; downtime approx. 0.333333333333333 hrs
|
|
2019-07-02
|
NA
|
NA
|
Gas Compressor #2 FC4 sensor fault; downtime approx. 0.05 hrs
|
|
2019-07-02
|
NA
|
NA
|
Suspension Buffer Tank high level caused pause on process; downtime approx. 3.66666666666667 hrs
|
|
2019-07-02
|
NA
|
NA
|
Polished Pulp Mix Pump #2 feed disable from high level; downtime approx. 0.0666666666666667 hrs
|
|
2019-07-02
|
NA
|
NA
|
Polished Pulp Mix Pump #1 feed disable from high level; downtime approx. 0.0666666666666667 hrs
|
|
2019-07-02
|
NA
|
NA
|
Organic Extrusion Press #2 FC4 sensor fault; downtime approx. 0.116666666666667 hrs
|
|
2019-07-02
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 apex blockage; downtime approx. 0.5 hrs
|
|
2019-07-02
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 apex blockage; downtime approx. 0.35 hrs
|
|
2019-07-02
|
NA
|
NA
|
Grit and Light Fraction Transfer Conveyor dbT Belt Conveyor Monthly Check
|
|
2019-07-02
|
NA
|
NA
|
Dry Fraction Transfer Conveyor dbT Belt Conveyor Monthly Check
|
|
2019-06-28
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-06-28
|
NA
|
NA
|
Aquablast conducted gas lance cleaning on AD2 under Anaergia supervision
|
|
2019-06-28
|
NA
|
NA
|
Organic Extrusion Press #1 BIOREX 300 Daily Check
|
|
2019-06-28
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-06-28
|
NA
|
NA
|
Digestate Transfer Pump #2 replaced pump seals; downtime approx. 12 hrs
|
|
2019-06-28
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-28
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-06-27
|
NA
|
NA
|
Residue Transfer Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-27
|
NA
|
NA
|
Grit and Light Fraction Transfer Conveyor dbT Belt Conveyor Weekly Check; downtime approx. 1 hrs
|
|
2019-06-27
|
NA
|
NA
|
Dry Fraction Transfer Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-27
|
NA
|
NA
|
Circulation Pump bypassed heat exchanger and ran water through circulation line; downtime approx. 2 hrs
|
|
2019-06-27
|
NA
|
NA
|
Rotary Drum Screen Empty Plastics from bin
|
|
2019-06-27
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-06-27
|
NA
|
NA
|
Polymer Make Up Package System faulted out
|
|
2019-06-27
|
NA
|
NA
|
Organic Extrusion Press #2 door sensor fault; downtime approx. 0.5 hrs
|
|
2019-06-27
|
NA
|
NA
|
Digester #2 Digester line plugged
|
|
2019-06-27
|
NA
|
NA
|
Polymer Make Up Package Panel over heated
|
|
2019-06-27
|
NA
|
NA
|
Duplex Basket Strainer Dirty filter baskets
|
|
2019-06-27
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #2 level sensors had to be manually positioned and cleaned; downtime approx. 1.36666666666667 hrs
|
|
2019-06-27
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 level sensors had to be manually positioned and cleaned; downtime approx. 1.23333333333333 hrs
|
|
2019-06-27
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-06-27
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-27
|
NA
|
NA
|
Bioreactor Aeration Blower # 3 (Standby) Aerzen D 62S Blower Weekly Maintenance
|
|
2019-06-27
|
NA
|
NA
|
Bioreactor Aeration Blower # 2 Aerzen D 62S Blower Weekly Maintenance
|
|
2019-06-27
|
NA
|
NA
|
Bioreactor Aeration Blower # 1 Aerzen D 62S Blower Weekly Maintenance
|
|
2019-06-27
|
NA
|
NA
|
Membrane Aeration Blower # 2 Aerzen GM 10S Blower Weekly Maintenance
|
|
2019-06-27
|
NA
|
NA
|
Membrane Aeration Blower # 1 Aerzen GM 10S Blower Weekly Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Bioreactor Aeration Blower # 3 (Standby) Aerzen D 62S Blower Semi-Annual Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Bioreactor Aeration Blower # 2 Aerzen D 62S Blower Semi-Annual Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Bioreactor Aeration Blower # 1 Aerzen D 62S Blower Semi-Annual Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Membrane Aeration Blower # 2 Aerzen GM 10S Blower Semi-Annual Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Membrane Aeration Blower # 1 Aerzen GM 10S Blower Semi-Annual Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Centrifuge #2 Centrifuge Weekly Flushing
|
|
2019-06-26
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-06-26
|
NA
|
NA
|
Dynamic Cyclone #2 dbT Dynamic Cyclone 2500 Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
Dynamic Cyclone #1 dbT Dynamic Cyclone 2500 Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
Process Water Pump #2 Belt Pulley Alignment; downtime approx. 1 hrs
|
|
2019-06-26
|
NA
|
NA
|
Preprocessing Assets Group Drain Blockage
|
|
2019-06-26
|
NA
|
NA
|
Organic Fraction Auger #2 Informed the auger cover is not installed properly. need to re-install.
|
|
2019-06-26
|
NA
|
NA
|
Duplex Basket Strainer Replace and clean filter baskets
|
|
2019-06-26
|
NA
|
NA
|
Duplex Basket Strainer Clean filter baskets
|
|
2019-06-26
|
NA
|
NA
|
Process Water Pump #2 Motor faults out
|
|
2019-06-26
|
NA
|
NA
|
Duplex Basket Strainer Clean filter baskets
|
|
2019-06-26
|
NA
|
NA
|
Polymer Make Up Package Polymer System Compressor
|
|
2019-06-26
|
NA
|
NA
|
Process Water Pump #2 Put pump back in service
|
|
2019-06-26
|
NA
|
NA
|
Polymer Make Up Package Over heated
|
|
2019-06-26
|
NA
|
NA
|
Duplex Basket Strainer Clean filter baskets
|
|
2019-06-26
|
NA
|
NA
|
Centrate Transfer Pump (Duty) Seal of pump is leaking; downtime approx. 0.5 hrs
|
|
2019-06-26
|
NA
|
NA
|
WWT Process Group WWT Assets Group Daily Inspection Round
|
|
2019-06-26
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-06-26
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-26
|
NA
|
NA
|
Polished Pulp Mix Pump #2 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Polished Pulp Mix Pump #1 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Raw Pulp Mix Pump #2 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Raw Pulp Mix Pump #1 Seepex BTVE Progressive Cavety Pump Weekly Maintenance
|
|
2019-06-26
|
NA
|
NA
|
Mix Pump Feed Auger #2 BioSec Screw Conveyor Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
Organic Fraction Auger #2 BioSec Screw Conveyor Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
Mix Pump Feed Auger #1 BioSec Screw Conveyor Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
Organic Fraction Auger #1 BioSec Screw Conveyor Weekly Check
|
|
2019-06-26
|
NA
|
NA
|
MOL on site investigating hazardous atmosphere complaint. Requested gas detector calibration records.
|
|
2019-06-25
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-25
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-25
|
NA
|
NA
|
Organic Extrusion Press #1 BIOREX 300 Daily Check
|
|
2019-06-25
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-25
|
NA
|
NA
|
Organic Extrusion Press #1 BIOREX 300 Daily Check
|
|
2019-06-25
|
NA
|
NA
|
Duplex Basket Strainer Replace and clean filter baskets
|
|
2019-06-25
|
NA
|
NA
|
Hydrocyclone Grit Removal Pkg #1 Replace Lobes on pump # m25
|
|
2019-06-25
|
NA
|
NA
|
Rotary Drum Screen Empty Plastics from bin
|
|
2019-06-25
|
NA
|
NA
|
Digestate Transfer Pump #2 Pump rebuild
|
|
2019-06-25
|
NA
|
NA
|
Dilution Water Transfer Pump #4 Inspect check valve; downtime approx. 0.25 hrs
|
|
2019-06-25
|
NA
|
NA
|
Dilution Water Transfer Pump #3 Inspect downstream check valve; downtime approx. 0.00416666666666667 hrs
|
|
2019-06-25
|
NA
|
NA
|
Dilution Water Transfer Pump #2 Fix/service passing check valve; downtime approx. 1.01666666666667 hrs
|
|
2019-06-25
|
NA
|
NA
|
Centrifuge #2 Centrifuge was plugged; downtime approx. 4 hrs
|
|
2019-06-25
|
NA
|
NA
|
Centrifuge #1 Centrifuge plugged; downtime approx. 4 hrs
|
|
2019-06-25
|
NA
|
NA
|
Anaerobic Digestion Process Group Anaerobic Digestion Assets Group Daily Inspection Round
|
|
2019-06-25
|
NA
|
NA
|
Preprocessing Assets Group Preprocessing Assets Group Daily Inspection Round
|
|
2019-06-25
|
NA
|
NA
|
Bidirectional Residue Discharge Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-25
|
NA
|
NA
|
Residue Transfer Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-25
|
NA
|
NA
|
Grit and Light Fraction Transfer Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-25
|
NA
|
NA
|
Dry Fraction Transfer Conveyor dbT Belt Conveyor Weekly Check
|
|
2019-06-25
|
NA
|
NA
|
Organic Extrusion Press #1 BIOREX 300 Daily Check
|